How soon can you strip concrete forms?

Article Tools

The engineer should always be present during the removal process, and all state or local mandates should be followed. Generally, the American Concrete Institute recommends the following: ASTM C 150 Type I cement : 7 days.
Previous postShould floors be darker or lighter than walls? Next postCan you use a convection oven as an air fryer?

Post Your Comment

You must be Logged in to post an answer.