Do you decorate before fitting a kitchen?

Article Tools

Kitchen fitting, order of work. The walls will need skimming/plastering, some electrical work will need doing such as new sockets, old kitchen ripped out, old flooring ripped up, new kitchen and flooring installed, new tiling and painting.
Previous postDoes soapstone darken over time? Next postWhat’s the best way to store bananas?

Post Your Comment

You must be Logged in to post an answer.